04 Industry
Wastewater treatment plant monitoring
Process parameters and energy on the same time axis, so discharge compliance and cost per cubic metre can be read together.
Illustrative figures.
What NeMo reads
The quantities that matter
The process is tuned on parameters, the costs are reviewed at month end, and the two numbers never meet. Meanwhile the blowers are the heaviest energy item on the plant.
Flows
Inlet and outlet, which bound the perimeter inside which every other number means something.
Process parameters
Dissolved oxygen, pH and redox potential, sampled often enough to see a reaction happen.
Turbidity and solids
At the outlet and in the tank, where compliance turns on a threshold and a duration.
Power draw
Blowers, pumps and dewatering: blowers alone are often half the plant's consumption.
Levels and running hours
To tell a machine running because it is needed from one nobody has re-tuned.
How it connects
It speaks your field’s language
Meters, analysers, controllers and probes: the node connects to what is already installed, over the protocol it already speaks. Nothing in the field is replaced to get started.
Powered on and already talking — self-configuring in the fieldWhat comes out
From the reading to the decision
kWh per cubic metre
The energy cost of treatment, comparable between lines and between periods.
Discharge trends
Compliance parameters continuously, with the windows where they left the band.
Removal efficiency
What the process is actually abating, rather than what it was designed to abate.
Environmental history
Continuous series for reporting, which holds up under a check years later.
Nearby industries
They usually come together
Start from your plants
A 30-minute technical call to go through what you already measure, what you do not, and what it would take to close the gap.