Skip to content

11 Industry

Data centre energy monitoring

PUE is by definition a ratio between two continuous measurements. If one of them is an estimate, it is not a PUE.

SNMP (PDU, UPS) Modbus Redfish / IPMI BACnet

Illustrative figures.

What NeMo reads

The quantities that matter

Total draw is known, per-rack draw is not. So headroom gets estimated, and you find out it ran out when a cabinet trips.

01

Draw per rack

Per PDU and per rack, the level at which headroom becomes a number rather than a guess.

02

UPS

Load and actual runtime, not the nameplate figure computed on new batteries.

03

Cooling

The consumption of the cooling plant, which is the missing numerator of PUE.

04

Aisles

Temperature and humidity in the hot and cold aisles, where airflow either works or does not.

05

Site draw

The site total, the other half of the ratio.

How it connects

It speaks your field’s language

Meters, analysers, controllers and probes: the node connects to what is already installed, over the protocol it already speaks. Nothing in the field is replaced to get started.

Powered on and already talking — self-configuring in the field

What comes out

From the reading to the decision

Measured PUE

Computed from two continuous measurements, which is what the indicator is by definition.

Headroom

Per rack and per row, before discovering it by installing and tripping a breaker.

Efficiency by season

How the cooling behaves as outside conditions change.

History for contracts

Continuous series behind the commitments made to customers.

Start from your plants

A 30-minute technical call to go through what you already measure, what you do not, and what it would take to close the gap.