Plant-wide energy consumption monitoring

Measure what each department, line and energy vector actually consumes, continuously, and keep the data ready for whoever has to verify it.

Modbus M-Bus OPC-UA DLMS/COSEM (Chain 2) SNMP

Illustrative figures.

What NeMo reads

The quantities that matter

Consumption is known from the bill: one monthly total for the whole plant. Enough to pay it, not enough to see where the energy goes, and not enough for an audit that has to rest on measurements.

01

Energy per department

Active and reactive per substation, line and machine, so consumption is attributed to whoever generates it instead of sitting in the site total.

02

Thermal vectors

Gas, steam, hot and chilled water on the same timeline as electricity: comparisons are then made between like quantities.

03

Compressed air

In Nm³ and in the kWh it takes to make it, which is the only way to know what a cubic metre really costs.

04

Power and peaks

Contracted power and the quarter-hourly profile with the peak dated, to see which start-up is pushing you over the threshold.

05

Production volumes

The parts that actually came out, because without the denominator the kWh cannot say whether a measure worked.

How it connects

It speaks your field’s language

Meters, analysers, controllers and probes: the node connects to what is already installed, over the protocol it already speaks. Nothing in the field is replaced to get started.

Powered on and already talking — self-configuring in the field

What comes out

From the reading to the decision

A baseline per department

Expected consumption per department and per vector, with no allocation keys invented at a desk.

Consumption per unit produced

The indicator that survives a comparison over time even when production volume changes.

Performance indicators

The EnPIs an energy management system rests on, computed the same way every time.

Measured time series

Continuous, traceable history, exportable for the energy audit and for whoever has to verify it.

Above 10 TJ a year the energy audit is mandatory, and from 2027 it can no longer rest on estimates. A measured history is not something you build in a fortnight.

Start from your plants

A 30-minute technical call to go through what you already measure, what you do not, and what it would take to close the gap.